{"id":2091,"date":"2022-05-20T11:38:26","date_gmt":"2022-05-20T11:38:26","guid":{"rendered":"https:\/\/staging.moye.design\/hps\/en\/?page_id=2091"},"modified":"2022-05-27T10:23:11","modified_gmt":"2022-05-27T10:23:11","slug":"access-road-sava-bridge","status":"publish","type":"page","link":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/","title":{"rendered":"Northern access roads to the new bridge over Sava river"},"content":{"rendered":"<h1>Northern access roads to the new bridge over the Sava river<\/h1>\n<div>The main design of the first phase of the UMP from To\u0161in bunar street to the beginning of the bridge over the Sava river<\/div>\n<div>\n<p><span style=\"color: #c78832;\">\u2014<\/span> HPS PROJECT<\/p>\n<\/div>\n<h1>Challenge<\/h1>\n<div>\n<p><span data-metadata=\"&lt;!--(figmeta)eyJmaWxlS2V5IjoiUUZOaHNNemxKQUtMNW92Vm1OT01LQyIsInBhc3RlSUQiOjU2NDIyNDY5NiwiZGF0YVR5cGUiOiJzY2VuZSJ9Cg==(\/figmeta)--&gt;\"><\/span><strong>The scope of this design is north access roads to the new bridge over the river Sava<\/strong>. The route starts at To\u0161in Bunar street and goes for 1,5km on the ground level. After passing Bulevar umetnosti street, it goes to the structure about 8m from ground level, and over 3 lanes, connects to the new Sava bridge.<\/p>\n<\/div>\n<p><img src=\"\/hps\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/project-most-na-adi-img01.jpg\" alt=\"\"><br \/>\n<img src=\"\/hps\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/project-most-na-adi-img02.jpg\" alt=\"\"><\/p>\n<div>\n<p><span style=\"color: #c78832;\">\u2014<\/span> HPS PROJECT<\/p>\n<\/div>\n<h1>Solution<span data-metadata=\"&lt;!--(figmeta)eyJmaWxlS2V5IjoiUUZOaHNNemxKQUtMNW92Vm1OT01LQyIsInBhc3RlSUQiOjUwNTAzNjI5LCJkYXRhVHlwZSI6InNjZW5lIn0K(\/figmeta)--&gt;\"><\/span><\/h1>\n<div>\n<p>The street profile consists of 3 lanes in each direction with 2 sidewalks and wide medians. Three large intersections were also designed. Besides road design and all associated infrastructure (water, sewerage, drainage, gas, electricity, telecommunications), we have done a traffic study in collaboration with competent authorities.<\/p>\n<p>The light rail system is designed from Milutina Milankovica street to the new bridge between two structures for the road traffic.<\/p>\n<p>Three crossroads and three interchanges are designed to link the newly designed ICSSR and the existing street network. Designed structures (bridges) are more than 10 km long.<\/p>\n<\/div>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"style\":\"default\",\"width\":\"large\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"image_position\":\"center-center\",\"padding\":\"large\",\"padding_remove_bottom\":false,\"title\":\"\",\"image\":\"wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/05\\\/project-most-na-adi-banner.jpg\",\"image_size\":\"cover\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"2-3\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"title_element\":\"h1\",\"title_style\":\"heading-2xlarge\",\"content\":\"Northern access roads to the new bridge over the Sava river\"}},{\"type\":\"headline\",\"props\":{\"title_element\":\"div\",\"title_style\":\"heading-medium\",\"title_color\":\"primary\",\"content\":\"The main design of the first phase of the UMP from To\\u0161in bunar street to the beginning of the bridge over the Sava river\",\"maxwidth\":\"2xlarge\",\"title_font_family\":\"secondary\",\"margin\":\"small\"}}]},{\"type\":\"column\",\"props\":{\"position_sticky_breakpoint\":\"m\",\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"1-3\"},\"children\":[]}],\"props\":{\"layout\":\"2-3,1-3\"}}],\"name\":\"hps hero unutra\\u0161nji\"},{\"type\":\"section\",\"props\":{\"style\":\"default\",\"width\":\"large\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"image_position\":\"center-center\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"position_sticky_breakpoint\":\"m\",\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"text\",\"props\":{\"margin\":\"small\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p><span style=\\\"color: #c78832;\\\">\\u2014<\\\/span> HPS PROJECT<\\\/p>\",\"text_color\":\"secondary\",\"text_style\":\"lead\",\"margin_remove_bottom\":false,\"css\":\".el-element {\\n  letter-spacing: 2px;\\n}\"}},{\"type\":\"headline\",\"props\":{\"title_element\":\"h1\",\"content\":\"Challenge\",\"title_style\":\"heading-xlarge\",\"margin_remove_top\":false,\"margin\":\"small\"}},{\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p><span data-metadata=\\\"&lt;!--(figmeta)eyJmaWxlS2V5IjoiUUZOaHNNemxKQUtMNW92Vm1OT01LQyIsInBhc3RlSUQiOjU2NDIyNDY5NiwiZGF0YVR5cGUiOiJzY2VuZSJ9Cg==(\\\/figmeta)--&gt;\\\"><\\\/span><strong>The scope of this design is north access roads to the new bridge over the river Sava<\\\/strong>. The route starts at To\\u0161in Bunar street and goes for 1,5km on the ground level. After passing Bulevar umetnosti street, it goes to the structure about 8m from ground level, and over 3 lanes, connects to the new Sava bridge.<\\\/p>\",\"text_style\":\"meta\",\"text_color\":\"secondary\",\"maxwidth\":\"xlarge\"}}]},{\"type\":\"column\",\"props\":{\"position_sticky_breakpoint\":\"m\",\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"1-2\",\"image\":\"\"},\"children\":[{\"type\":\"image\",\"props\":{\"margin\":\"large\",\"image_svg_color\":\"emphasis\",\"image\":\"wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/05\\\/project-most-na-adi-img01.jpg\",\"text_align\":\"right\",\"maxwidth\":\"2xlarge\"}}]}],\"props\":{\"layout\":\"1-2,1-2\",\"width\":\"large\"}}],\"name\":\"hps bela sekcija\"},{\"type\":\"section\",\"props\":{\"style\":\"secondary\",\"width\":\"large\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"image_position\":\"center-center\",\"preserve_color\":true},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"position_sticky_breakpoint\":\"m\",\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"image\",\"props\":{\"margin\":\"large\",\"image_svg_color\":\"emphasis\",\"image\":\"wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/05\\\/project-most-na-adi-img02.jpg\",\"text_align\":\"right\",\"maxwidth\":\"2xlarge\"}}]},{\"type\":\"column\",\"props\":{\"position_sticky_breakpoint\":\"m\",\"image_position\":\"center-center\",\"media_overlay_gradient\":\"\",\"width_medium\":\"1-2\",\"image\":\"\"},\"children\":[{\"type\":\"text\",\"props\":{\"margin\":\"small\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p><span style=\\\"color: #c78832;\\\">\\u2014<\\\/span> HPS PROJECT<\\\/p>\",\"text_color\":\"secondary\",\"text_style\":\"meta\",\"margin_remove_bottom\":false}},{\"type\":\"headline\",\"props\":{\"title_element\":\"h1\",\"content\":\"Solution<span data-metadata=\\\"&lt;!--(figmeta)eyJmaWxlS2V5IjoiUUZOaHNNemxKQUtMNW92Vm1OT01LQyIsInBhc3RlSUQiOjUwNTAzNjI5LCJkYXRhVHlwZSI6InNjZW5lIn0K(\\\/figmeta)--&gt;\\\"><\\\/span>\",\"title_style\":\"heading-xlarge\",\"margin_remove_top\":false,\"margin\":\"small\"}},{\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>The street profile consists of 3 lanes in each direction with 2 sidewalks and wide medians. Three large intersections were also designed. Besides road design and all associated infrastructure (water, sewerage, drainage, gas, electricity, telecommunications), we have done a traffic study in collaboration with competent authorities.<\\\/p>\\n\n\n<p>The light rail system is designed from Milutina Milankovica street to the new bridge between two structures for the road traffic.<\\\/p>\\n\n\n<p>Three crossroads and three interchanges are designed to link the newly designed ICSSR and the existing street network. Designed structures (bridges) are more than 10 km long.<\\\/p>\",\"text_style\":\"meta\",\"text_color\":\"secondary\",\"maxwidth\":\"xlarge\"}}]}],\"props\":{\"layout\":\"1-2,1-2\",\"width\":\"large\",\"column_gap\":\"large\"}}],\"name\":\"hps case study plava\"}],\"version\":\"2.7.21\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Northern access roads to the new bridge over the Sava river The main design of the first phase of the UMP from To\u0161in bunar street to the beginning of the bridge over the Sava river \u2014 HPS PROJECT Challenge The scope of this design is north access roads to the new bridge over the river [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"acf":[],"aioseo_notices":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.10 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN\" \/>\n<meta property=\"og:description\" content=\"Northern access roads to the new bridge over the Sava river The main design of the first phase of the UMP from To\u0161in bunar street to the beginning of the bridge over the Sava river \u2014 HPS PROJECT Challenge The scope of this design is north access roads to the new bridge over the river [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/\" \/>\n<meta property=\"og:site_name\" content=\"Hidro-projekat saobra\u0107aj - EN\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-27T10:23:11+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/\",\"url\":\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/\",\"name\":\"Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN\",\"isPartOf\":{\"@id\":\"https:\/\/hps.rs\/en\/#website\"},\"datePublished\":\"2022-05-20T11:38:26+00:00\",\"dateModified\":\"2022-05-27T10:23:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/hps.rs\/en\/access-road-sava-bridge\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/hps.rs\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Northern access roads to the new bridge over Sava river\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/hps.rs\/en\/#website\",\"url\":\"https:\/\/hps.rs\/en\/\",\"name\":\"Hidro-projekat saobra\u0107aj - EN\",\"description\":\"Road Design Research &amp; Studies Engineering &amp; Supervision\",\"publisher\":{\"@id\":\"https:\/\/hps.rs\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/hps.rs\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/hps.rs\/en\/#organization\",\"name\":\"Hidroprojekat saobra\u0107aj - EN\",\"url\":\"https:\/\/hps.rs\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/hps.rs\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/hps.rs\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/Logo.png\",\"contentUrl\":\"https:\/\/hps.rs\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/Logo.png\",\"width\":450,\"height\":126,\"caption\":\"Hidroprojekat saobra\u0107aj - EN\"},\"image\":{\"@id\":\"https:\/\/hps.rs\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/hidroprojekat-saobracaj\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/","og_locale":"en_US","og_type":"article","og_title":"Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN","og_description":"Northern access roads to the new bridge over the Sava river The main design of the first phase of the UMP from To\u0161in bunar street to the beginning of the bridge over the Sava river \u2014 HPS PROJECT Challenge The scope of this design is north access roads to the new bridge over the river [&hellip;]","og_url":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/","og_site_name":"Hidro-projekat saobra\u0107aj - EN","article_modified_time":"2022-05-27T10:23:11+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/","url":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/","name":"Northern access roads to the new bridge over Sava river - Hidro-projekat saobra\u0107aj - EN","isPartOf":{"@id":"https:\/\/hps.rs\/en\/#website"},"datePublished":"2022-05-20T11:38:26+00:00","dateModified":"2022-05-27T10:23:11+00:00","breadcrumb":{"@id":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hps.rs\/en\/access-road-sava-bridge\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/hps.rs\/en\/access-road-sava-bridge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hps.rs\/en\/"},{"@type":"ListItem","position":2,"name":"Northern access roads to the new bridge over Sava river"}]},{"@type":"WebSite","@id":"https:\/\/hps.rs\/en\/#website","url":"https:\/\/hps.rs\/en\/","name":"Hidro-projekat saobra\u0107aj - EN","description":"Road Design Research &amp; Studies Engineering &amp; Supervision","publisher":{"@id":"https:\/\/hps.rs\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hps.rs\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hps.rs\/en\/#organization","name":"Hidroprojekat saobra\u0107aj - EN","url":"https:\/\/hps.rs\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hps.rs\/en\/#\/schema\/logo\/image\/","url":"https:\/\/hps.rs\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/Logo.png","contentUrl":"https:\/\/hps.rs\/en\/wp-content\/uploads\/sites\/2\/2022\/05\/Logo.png","width":450,"height":126,"caption":"Hidroprojekat saobra\u0107aj - EN"},"image":{"@id":"https:\/\/hps.rs\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/hidroprojekat-saobracaj\/"]}]}},"_links":{"self":[{"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/pages\/2091"}],"collection":[{"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/comments?post=2091"}],"version-history":[{"count":28,"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/pages\/2091\/revisions"}],"predecessor-version":[{"id":2562,"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/pages\/2091\/revisions\/2562"}],"wp:attachment":[{"href":"https:\/\/hps.rs\/en\/wp-json\/wp\/v2\/media?parent=2091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}