During the company’s long history, we have done several hundred traffic infrastructure projects.
— HPS PROJECT
Tošin bunar street to the Ada bridge entrance
Main design of the first phase of the UMP from Tosin bunar street to the beginning of the bridge over the Sava river
The scope of this design are north access roads to the new bridge over the river Sava. The route starts at Tosin Bunar street and goes for 1.5 km on the ground level.