Projects

During the company’s long history, we have done several hundred traffic infrastructure projects.

HPS PROJECT

Tošin bunar street to the Ada bridge entrance

Main design of the first phase of the UMP from Tosin bunar street to the beginning of the bridge over the Sava river

The scope of this design are north access roads to the new bridge over the river Sava. The route starts at Tosin Bunar street and goes for 1.5 km on the ground level.

HPS PROJECTS

More about our projects

  • The main E-75 highway design, section
    Grabovnica – Grdelica

  • The main E-80 highway design, section
    Crvena reka – Ćiflik

  • Safety improvements at the Kruševac bypass